[A Busy Year at the Old Squire’s by Charles Asbury Stephens]@TWC D-Link bookA Busy Year at the Old Squire’s CHAPTER X 4/13
Two carpenters appeared and laid the sills for an addition to the house, twenty feet long by eighteen feet wide, just behind the kitchen, which was in the L.The room that they built had a door opening directly into the kitchen.
The floor, I remember, was of maple and the walls of matched spruce. Meanwhile the old Squire had had a sewer dug about three hundred feet long; and to hold the water supply he built a tank of about a thousand gallons' capacity, made of pine planks; the tank was in the attic directly over the kitchen stove, so that in winter heat would rise under it through a little scuttle in the floor and prevent the water from freezing. From the tank the pipes that led to the new bathroom ran down close to the chimney and the stove pipe.
Those bathroom pipes gave the old Squire much anxiety; there was not a plumber in town; the old gentleman had to do the work himself, with the help of a hardware dealer from the village, six miles away. But if the pipe gave him anxiety, the bathtub gave him more.
When he inquired at Portland about their cost, he was somewhat staggered to learn that the price of a regular tub was fifty-eight dollars. But the old Squire had an inventive brain.
He drove up to the mill, selected a large, sound pine log about four feet in diameter and set old Davy Glinds, a brother of Hughy Glinds, to excavate a tub from it with an adze.
<<Back Index Next>> D-Link book Top TWC mobile books
|