[The Sagebrusher by Emerson Hough]@TWC D-Link book
The Sagebrusher

CHAPTER XXIX
2/14

The camp of the reclamation engineers and construction men lay upon a bench or plateau which once formed the bank of the stream upon that side, now about half way up to the top of the great dam.

The road running up and down the valley ascended from this plateau to a sufficient elevation to surmount the permanent water level above the upper dam.

On the opposite side rose a sheer and bare rock running two-thirds up to the top of the mountain peak which here had shouldered its way down as though in curiosity to look at the bottom of the gorge itself.

The great dam was anchored to the rock face on that side, and it was there that the chutes and wells for the turbines were located, as well as the spill gates which now were in temporary service.

A wide roadway of cement, with vast buttresses on each side, ran along the top of the dam and looked down upon the abrupt surface of its lower face.
Here, and there, at either side of the dam, and at the original stream level, stood low buildings of stone, to house the vast dynamos or care for other phases of the tremendous industrial installation of the National Government.
Here and there were stationed the armed guards, in the uniform of the Army.


<<Back  Index  Next>>

D-Link book Top

TWC mobile books