[Forty-one years in India by Frederick Sleigh Roberts]@TWC D-Link book
Forty-one years in India

CHAPTER XXXIX
9/22

I agreed, knowing how clever Natives often are at this kind of work, and thinking I might just as well have two strings to this particular bow.

Immediately, numbers of men were to be seen felling the bamboos on the hillside a short distance above the stream: these were thrown into the river, and as they came floating down they were caught by men standing up to their necks in water, who cut them to the required length, stuck the uprights into the river-bed, and attached them to each other by pieces laid laterally and longitudinally; the flooring was then formed also of bamboo, the whole structure was firmly bound together by strips of cane, and the bridge was pronounced ready.

Having tested its strength by marching a large number of men across it, I sent for my Engineer friend.

His astonishment on seeing a bridge finished ready for use was great, and became still greater when he found how admirably the practical woodmen had done their work; from that time, being assured of their ability to assist him, he wisely availed himself when difficulties arose of their useful, if unscientific, method of engineering.
By the 14th December matters had so far progressed as to warrant an advance.

As our route now lay away from the river, scarcity of water entailed greater care being taken in the selection of encamping grounds, so on arriving at our halting-place each day I had to reconnoitre ahead for a suitable site for our next resting-ground, a considerable addition to the day's work.


<<Back  Index  Next>>

D-Link book Top

TWC mobile books