[The Romance of the Colorado River by Frederick S. Dellenbaugh]@TWC D-Link bookThe Romance of the Colorado River CHAPTER VII 6/41
It was an uncomfortable spot for expedition headquarters, but the best that could be had, as the Monterey was not permitted by her owners to venture farther up the river.
But this delay, discomfort, and difficulty, to say nothing of expense, might have been avoided could a contract have been made with the existing steamboat company.
As the bank on which the boat was to be reconstructed was not likely to be overflowed more than a foot by the next high tide, a month later, an excavation was made wherein to build the steamer that she might certainly come afloat at the desired time.
Sixty holes had to be made in the iron plates so that the four stiffening timbers could be attached to the bottom to prevent the craft from breaking in two under the extra-heavy boiler.
Inside, cross timbers were also added to resist the strain.
<<Back Index Next>> D-Link book Top TWC mobile books
|